Warehouse structural testing

The static test verifies the conformity of the warehouse system by checking the consistency between what has been installed and the project.

The static test verifies the conformity of the warehouse system by checking the consistency between what has been installed and the project.

Our company is your ideal partner for an objective and neutral verification of the conformity of the work carried out, in detail:

  • Verification of the correspondence between the designed and the realized structure;
  • Control of the certificates on the tests of the structural materials used;
  • Examination of the project and that all structural elements pass the checks required by law.

At the end of testing, a certificate is drawn up with the results of the verification carried out, including:

  • Introduction: the details of the project and the data of the people involved in its implementation.
  • Objective: the reference regulations in force followed for the verification of the system.
  • Report: comparison between measurements taken on the installed system and those provided by the initial project.
  • Conclusion: the authorization to use the system or the corrective actions necessary to receive validation of the system.

In the event of detected non-conformities, our company is also able to intervene on them by carrying out adjustment work in order to issue the permit for use.

Ask for more information! Ask for more information!

    Warehouse structural testing
    Magazine See all